HomeMy WebLinkAboutREFAC PPT IIJanuary 18, 2018
Renewable Energy Fund
Advisory Committee (REFAC)
2
Welcome and Introductions
Kodiak nearly 100% renewable
3Kodiak, AK
Integrated system
•Terror Lake hydro
•Pillar Mt. wind
•Battery
•Diesel
2016 generation
•19.0% wind
•80.7% hydro
•0.3% diesel
1.Refreshers
A.Energy in Alaska
B.REF evaluation
C.REFAC advisory role
2.REF impact to date
3.Governor’s budget
A.Recommended projects
4.Project financing
5.PCE earnings as a funding
source
4
1.REFAC support for recommended
projects
2.Input moving forward with new funding mechanism
Agenda Objectives
St. Paul, AK (photo courtesy TDX Power)
5
Energy in Alaska
740,000 People
660,000 Sq. Miles
200 Islanded power
systems
6
Railbelt
72% of Pop
76% of Energy
Southeast
10% of Pop
13% of Energy
Rest of AK
18% of Pop
11% of Energy
REF Statutory Guidance
Eligible projects must:
1.Be a new project not in operation in 2008, and
2.Be a hydro, direct use of renewable energy, a facility that generates electricity from fuel cells that use hydrogen from RE or natural gas (certain conditions for natural gas), or be a facility that generates electricity using renewable energy.
“…develop a methodology for determining the order of projects that may receive assistance, including separate requirements for grant eligibility, and adopt regulations
identifying criteria to evaluate the benefit and feasibility of projects for which an applicant
applies for support from the legislature, with the most weight being given to projects that
serve any area in which the average cost of energy to each resident of the area exceeds
the average cost to each resident of other areas of the state, and significant weight being given to a statewide balance of grant funds and to the amount of matching funds an applicant is able to make available…”
7
Four Stage REF Evaluation Process
1.Completeness/eligibility (AEA staff)
2.Feasibility and public benefit (AEA, DNR, Contractors)
A.Technical and economic evaluation
B.Qualifications and experience of team
C.Project management/dev/operation
3.Ranking projects (AEA/REFAC)
A.Cost of energy single biggest criterion (35%)
B.Levelized feasibility score from stage 2 (20%)
C.Other criteria include public benefits, readiness, local support and match
4.Regional spreading (AEA/REFAC)
8
REFAC Advisory Committee Consists Of:
•5 members shall be appointed by the governor to staggered -one
representative to be appointed from each of the following
•small Alaska rural electric utilities;
•large Alaska urban electric utilities;
•Alaska Native organizations;
•businesses or organizations engaged in the renewable energy sector; and
•the Denali Commission established under P.L. 105-277, 42
•2 members of the house of representatives appointed by the speaker of
the house of representatives; and
•2 members of the senate appointed by the president of the senate
9
REFAC input since inception has included:
•Increased focus on high cost energy communities
•Encourage heat projects
•Encourage energy efficiency points in scoring for heat projects
•Regional spreading of grant funds
•Support recommendations to the legislature
10
REF spending to
date by region
11
12
REF spending to
date by
resource
13
Renewable Energy Fund
Projects Completed/Under
Development
End of Year 201670 Projects operational
63 projects underway
42 funded through
construction
14 design/ permitting
7 recon/feasibility
14
•$257 million granted in
Rounds I to VIII
•851 total applications
received
•287 applications funded
•No new appropriations Rounds IX and X
REF in the Governor’s
FY19 Budget:
$11 million in REF grants
$3 million to
administer
15
Where the $ came from
July 1 DOR calculates:
1.The monthly average market value of the PCE endowment fund for previous three fiscal years, AND
2.The earnings of the fund for the previous closed fiscal year.
•5% of the amount calculated using #1 above is available to appropriate for PCE program/admin
•If the amount calculated using #2 above is greater than the
amount appropriated to the program, then 70% of the
difference is available to appropriate to:
•First $30 million to Community Revenue Sharing or Community Assistance
•Up to $25 million to REF, Bulk Fuel Revolving Loan Fund, Rural Power System Upgrades
Projects in Governor’s budget
Project name Location Resource type Phase Request
Fivemile Creek Chitina Hydro Construction $3,400,000
Wales heat recovery Wales Heat Recovery Design/Construct $650,047
Adak Hydro Adak Hydro Feasibility $19,600
Water system heat
recovery
Koyuk Heat Recovery Design $90,922
Shishmaref wind Shishmaref Wind Feasibility/
concept. design
$152,000
City Heat Pump Seward Seawater heat pump Design/Construct $725,000
Gunnuk Creek Kake Hydro Construction $3,920,000
Mt. Village –St. Mary’s
Intertie
Mountain
Village
Transmission, Wind Design/Construct $2,506,731
16
Fivemile Creek Project:
300 kW run of river hydro
Displace estimated 500 MWhs diesel generation
Estimated total project cost: $6.6 million
Grant request: $3.4 million
Project phase: Construction
Calculated B/C: 1.71
Impacted population: 116
Applicant: Chitina Electric Inc.
Region: Copper River/Chugach
17
Wales Heat Recovery Project:
Send recovered heat water treatment plant and washeteria
Estimated fuel savings more than 9,700 gallons/year
Estimated total project cost: $656,613
Grant request: $650,047
Project phase: Design/Construction
Calculated B/C: 1.44
Impacted population: 146
Applicant: City of Wales
Region: Bering Straits
18
Adak Hydro Project:
75-90 kW power recovery turbine on water supply line
Displace 330-760 MWh of diesel energy
Estimated total project cost: $28,000 (feasibility only)
Grant request: Recommended for partial funding $19,600
Project phase: Feasibility
Calculated B/C: 1.75
Impacted population: 247
Applicant: TDX Adak Generating
Region: Aleutians
19
Koyuk Heat Recovery Project:
Send recovered heat to city water treatment plant and washeteria
Estimated fuel savings nearly 12,000 gallons/year
Estimated total project cost: $98,022
Grant request: Recommended for partial funding $90,922
Project phase: Feasibility/Design
Calculated B/C: 1.06
Impacted population: 321
Applicant: City of Koyuk
Region: Bering Straits
20
Shishmaref Wind Project:
Wind feasibility and conceptual design
Preliminary estimates displace just under 1,500 gallons/year
Estimated total project cost: $160,000 (feasibility only)
Grant request: $152,000
Project phase: Feasibility
Calculated B/C: 0.93
Impacted population: 607
Applicant: Alaska Village Electric Cooperative (AVEC)
Region: Bering Straits
21
Seward Seawater Heat Pump Project:
Seawater heat pump serving four existing and one future city building
Estimated displacement more than 20,000 gallons/year
Estimated total project cost: $955,458
Grant request: $725,000
Project phase: Design/Construction
Calculated B/C: 1.97
Impacted population: 2,768
Applicant: City of Seward
Region: Railbelt
22
Gunnuk Creek Hydro Project
500 kW hydro addition to water supply dam serving Kake
Displace estimated 1,620 MWh of diesel generation
Estimated total project cost: $5.7 million
Grant request: $3.92 million
Project phase: Construction
Calculated B/C: 2.23
Impacted population: 1,913 (563 in Kake)
Applicant: Inside Passage Electric Cooperative
Region: Southeast
23
Mt. Village –St. Mary’s Intertie Project:
Intertie connecting Mt. Village to St. Mary’s renewable power
Displace estimated 60,000 gallons/year
Estimated total project cost: $6.2 million
Grant request: $3.196 million
Project phase: Design/Construction
Calculated B/C: 1.0
Impacted population: 1,524 (857 Mt. Village)
Applicant: Alaska Village Electric Cooperative
Region: Lower Yukon-Kuskokwim
24
Previously recommended projects removed from list
1.Sand Point high penetration wind system could not progress b/c of equipment regulations
2.Grayling secured federal funds for heat recovery design
3.City of Chignik hydro design –design complete, pursuing construction
4.Kodiak Electric Upper Hidden Basin feasibility -moving forward w/o grant
5.Eek Heat Recovery design –design complete w/ other funding
6.Neck Lake hydro no longer being pursued
7.Chugach Electric solar feasibility –moving forward w/o grant
8.King Cove completed their hydro financing package with AEA loan
25
Recommended but did not fit in the Governor’s budget
26
Project Financing -working with fewer State grants
•Helping communities make the grants-to-loans transition
•Providing technical assistance and ongoing community support
•Maintaining collaborative partnerships & fostering innovation
•Boots on the ground building safe, stable, reliable,
and affordable community energy systems
•Researching and coordinating development of
new state energy policy
27
Allison Creek Hydro Project in Valdez
28
Need remains constant
Yet availability of public funding to help meet that need is decreasing
2017 the future
The future points to more dynamic funding
Project Financing Tech Assist –Accessing Funding
29
Internal to Utility Funds
•Reporting to optimize PCE
•Rate setting to cover all costs
•Evaluation of project financial impacts
•Utility business practice to
improve financial health
External to Utility Funds
•Research grant opportunities
•Assist with grant application
development
•Research loan opportunities
•Assist with loan application
development
•Administer PPF program
The Power Project Fund Loan
Program
•Flexible loan program
•Covers all aspects of supply side system
•Available for all project dev. phases
•Technical, economic and finance viability
•Increased interest and activity recently
•Anticipate activity will continue to grow
2
Waterfall Creek Construction
Healy, AK
PCE earnings as a funding source
If/when this happens, how should the REFAC recommend projects to forward to the legislature?
31
PCE earnings as a funding source
•SB 196 –how it works
•July 1 DOR calculates:
1.The monthly average market value of fund for previous three fiscal years, AND
2.The earnings of the fund for the previous closed fiscal year.
•5% of the amount calculated using #1 above is available to appropriate for PCE
program/admin
•If the amount calculated using #2 above is greater than the amount appropriated to the program, then 70% of the difference is available to appropriate to:
•First $30 million to Community Revenue Sharing or Community Assistance
•Up to $25 million to REF, Bulk Fuel Revolving Loan Fund, Rural Power System Upgrades
•Calendar considerations –July DOR calculates PCE earnings, January legislature in session (inadequate time for new solicitation/evaluation)
32
PCE earnings as a funding source
•Some possible changes to consider (AEA is not advocating for any of the
ideas below)
•Request $ amount rather than line item appropriation (requires statutory change)
•Request $ to be held for a year to allow time for a solicitation -allowing for line item appropriation (requires statutory change)
•Use some earnings to capitalize an RE specific loan fund/recapitalize the PPF (requires statutory change)
•Other ideas/funding sources?
•Identify a path forward, REFAC guidance needed
33
Scheduling next REFAC meeting
34
35
Closing comments
36
ALASKA ENERGY AUTHORITY
813 West Northern Lights Blvd.
Anchorage, Alaska 99503
Phone: (907) 771-3000
Fax: (907) 771-3044
Toll Free (Alaska Only) 888-300-8534
AEA’s mission: Reduce the cost of energy in Alaska.