Loading...
HomeMy WebLinkAboutREFAC requests from 12032019 meetingREFAC requests 1. Breakdown of REF operations budget (how are we using $1.948M and $1.4M for FY20 & 21) 2. Send out RFA to committee before release 3. Sen. Wilson requested match by project 4. Check accuracy of map 5. Come up with a better way to deal with Blue Lake/Terror Lake 6. Update # in Process summary 7. Small change to minutes 11/2018 (add Lee, remove meetings attended) 8. Operations plans a. Small changes to operations plan b. Simplified operations plan for pre-construction projects REFAC motions & advice to AEA 1. Data and analysis—research options, determine cost 2. Status report 3. Do not change weighting of match 4. Changes to RFA a. Language for metering/tracking b. Language for incentivizing supply- and demand-side efficiency c. Targets for projects: 75% Recon/Feasibility/Conceptual design, 25% design & construction d. Remove heat project goal e. Limit total project cost to $2M/$1M (provide clarifying language up front that it is project cost and not grant)